Preventative Maintenance Schedule

Created by SVE Labs, Modified on Mon, 18 Mar, 2024 at 3:02 PM by SVE Labs

Daily

Scan Lens Tabs (Approved tech by GM)

Clean all equipment surfaces (polish, dust, Etc)

Clean any lap tools used (Clean Surface well, make sure #s are legible)

Clean any Alloy Blocks used (wipe/scrub polish) 


Weekly

Clean 7E Filter

Clean 2G Filter 

Clean out Alloy Reclaim Tank of sediment 


Monthly

505 Pin replacement

Clean Lap Tool Shelving (Polish/Dust)


Quarterly

Layout Marker Calibration

3B Axis Calibration

7E Axis Calibration

7E polish Wheel Cleaning 

2G Axis Calibration


Semi Annual

505 Wobble Plates

505 Pattern Calibration

Clean inside 3B (dust removal)

Clean inside 4T (dust removal)

Clean inside Cure Unit (dust removal)

Replace 2G Bit 

Annual 

Deep Clean 7E (Carriage Disassembly)

Deep Clean 2G (Carriage Disassembly) 


As Needed

Size/Bevel Calibration on 7E

Center Thickness Calibration on 2G

Axis Calibrations on 7E, 2G, & 3B

Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article