Power Cycle
Verify 120V from Power Cord to 2G
Verify 5V at Black Box test points (If no Power, Check Fuse & Wires at Power Switch and Power Receptacle (Including Jumper wire)).
Check CMOSS Battery (Back Processor Board) for 3V, Replace as needed.
Was this article helpful?
That’s Great!
Thank you for your feedback
Sorry! We couldn't be helpful
Thank you for your feedback
Feedback sent
We appreciate your effort and will try to fix the article